1154 – 1160 Hay Street, West Perth
This 4 storey commercial office with an underground basement features a six star energy rating and tight integration of Architectural intent to maximise light and energy absorption
DetailsThis 4 storey commercial office with an underground basement features a six star energy rating and tight integration of Architectural intent to maximise light and energy absorption
DetailsRenovation of existing building and addition of new multi purpose building to create a bright and functional centre of learning
DetailsThis award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.
DetailsMulti level luxury apartment complex in Scarborough was designed for the use of glass fibre reinforced polymer reinforcement in concrete for the aquatic environment, top-down construction design, and post-tensioned concrete slabs for reinforcement
DetailsRemediation of this community board walk located on Swan River used Glass Fibre Reinforced Polymer (GFRP) rods as reinforcement in concrete in place of steel to deliver a design with rated 75 years of longevity despite a corrosive aqueous environment.
DetailsHeavy pavement solutions for industrial equipment works for Westrac in multiple maintenance sites throughout WA and NSW; also included design of new administration and other facilities
DetailsMulti level shopping and car park development on the South Perth foreshore
DetailsInvestigation of this cracked Heritage site tracked down the root cause to an unsuccessful refurbishment which was then able to be permanently remediated.
DetailsGeorge Slater, the first European settler in Goomalling, built the Slater Homestead in 1856 on a pastoral lease.
DetailsThis major development consisted of eight projects for the Royal Australian Navy at the Garden Island facility in Western Australia, and won an RAN commendation for its innovative use of post-tensioned concrete flooring.
Details