1154 – 1160 Hay Street, West Perth
This 4 storey commercial office with an underground basement features a six star energy rating and tight integration of Architectural intent to maximise light and energy absorption
This 4 storey commercial office with an underground basement features a six star energy rating and tight integration of Architectural intent to maximise light and energy absorption
This modern office development located in Applecross utilised top-down construction to meet the financial limits of the client and make the project viable to construct.
Adaptive re-use of this Heritage structure used the full suite of Airey Taylor Consulting’s Scientific and Structural skills; proving that adaptation and restoration of upper level Heritage structures with continued use of ground floor tenancies can be a more attractive option for owners than the current industry practice of facadism in Heritage settings.
Value engineering by Airey Taylor Consulting generated significant cost savings for this United Arab Emirates skyscraper, leading to it eventually being able to encompass 40 storeys in height
Airey Taylor Consulting provided design and documentation of this $45 M industrial project in Forrestfield, comprising of 4 structural steel warehouses and office space.
Multi storey commercial office building located in the Perth CBD
Multi-storey mixed use apartment development on the Bunbury foreshore that utilised old grain silos in the structural development to integrate and highlight the unique heritage aspects of the area.
This multidiscplinary science building for Curtin University students uses an adaptation of an existing concrete framed shell with new steel elements to incorporate extensive air conditioning for labwork and house heavy scientific equipment in a state-of-the-art facility
Heavy pavement solutions for industrial equipment works for Westrac in multiple maintenance sites throughout WA and NSW; also included design of new administration and other facilities
Re-construction and refurbishment of the Claremont Council Chambers previously destroyed by fire, adding three storeys of functional and attractive office space while restoring the heritage fronting.