WA Landfill Services Waste Recycling Facility Stage 1, Welshpool
Civil engineering and pavement design for this project built in durability factors for the acidity of waste products and heavy load of equipment of the facility.
Civil engineering and pavement design for this project built in durability factors for the acidity of waste products and heavy load of equipment of the facility.
Award winning aquatic recreation centre in Penrith, NSW.
Airey Taylor Consulting’s Structural Engineering skills enabled rapid modelling and structural design of the durable aluminum sculptures, activating the Mends Street area at the new civic heart of South Perth as part of their Connect South revitalisation project
Airey Taylor Consulting provided the initial design and subsequent engineering for all structural works on this landmark Perth hotel from 1971 onwards
$38 M redevelopment project of the existing Mandurah Aquatic & recreation centre creates timeless style while adding world class function to this community centre
Remediation of this community board walk located on Swan River used Glass Fibre Reinforced Polymer (GFRP) rods as reinforcement in concrete in place of steel to deliver a design with rated 75 years of longevity despite a corrosive aqueous environment.
This iconic project of international significance at Wadjemup (Rottnest Island) achieves world-class durability despite oceanic salinity and corrosion due to Airey Taylor Consulting’s Structural Engineering capacity using glass fibre reinforced polymer rods in concrete
This two stage project provides a quality Primary School and Kindergarten to the growing Forrestdale area with introduced energy efficiency through natural lighting in classrooms
Airey Taylor Consulting’s structural design for Glass Fibre Reinforced Polymer using rods as reinforcement in concrete radically extend the life of this new Dolphin and Boat Ramp at Australia’s northern most Island
A $31 M sporting redevelopment as part of the ‘Claremont on the Park’ project