The Colonnade redevelopment transformed the existing retail development into an exciting mixed use facility in the heart of Subiaco, achieving cost efficiencies of $900,000 by using banded pre-stressed concrete design.
St Quentin’s Apartments were architecturally conceived by CMP Architects to provide a striking gateway building to the Town Centre precinct of Claremont, and utilised revolutionary top-down construction and permanent form concrete walls to both speed completion of the project and integrate construction into the prestigious neighbourhood with minimum disruption.
This award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.