19 – 21 Kintail Road Office Development, Applecross
This modern office development located in Applecross utilised top-down construction to meet the financial limits of the client and make the project viable to construct.
DetailsThis modern office development located in Applecross utilised top-down construction to meet the financial limits of the client and make the project viable to construct.
DetailsA $31 M sporting redevelopment as part of the ‘Claremont on the Park’ project
DetailsThe State Theatre Centre of WA offers an iconic range of flexible spaces from an open air courtyard to the famous Health Ledger Theatre. This building faced a range of dynamic challenges from the placement, height restrictions, access and the theatre extending over 8 metres below the water table. The project received the 2011 Australia Engineers National Award for Excellence for its suite of solutions to these challenges.
DetailsRe-construction and refurbishment of the Claremont Council Chambers previously destroyed by fire, adding three storeys of functional and attractive office space while restoring the heritage fronting.
DetailsWinner of the 2017 Master Builders Association/Bankwest Best Project overall, this project features extensive use of post tensioned concrete to achieve its award winning result
DetailsCivil engineering and pavement design for this project built in durability factors for the acidity of waste products and heavy load of equipment of the facility.
DetailsProvided Structural and Materials advice for concept design of a unique ‘refuge structure’ for disaster prone areas, now patented in Australia and the United States
DetailsThis 4 storey commercial office with an underground basement features a six star energy rating and tight integration of Architectural intent to maximise light and energy absorption
DetailsRenovation of existing building and addition of new multi purpose building to create a bright and functional centre of learning
DetailsThis award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.
Details