Cockburn Central Stage 3, Success
This award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.
DetailsThis award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.
DetailsMulti level luxury apartment complex in Scarborough was designed for the use of glass fibre reinforced polymer reinforcement in concrete for the aquatic environment, top-down construction design, and post-tensioned concrete slabs for reinforcement
DetailsHeavy pavement solutions for industrial equipment works for Westrac in multiple maintenance sites throughout WA and NSW; also included design of new administration and other facilities
DetailsMulti level shopping and car park development on the South Perth foreshore
DetailsThis major development consisted of eight projects for the Royal Australian Navy at the Garden Island facility in Western Australia, and won an RAN commendation for its innovative use of post-tensioned concrete flooring.
DetailsGerman designed luxury motor vehicle dealership located in Mandurah, utilising Airey Taylor’s extensive Value Engineering and post-tensioned concrete experience to deliver a result of international quality.
DetailsAirey Taylor Consulting were engaged by Komatsu Australia to assess the suitability of the existing structure of the Reman Workshop for upgrade to the lifting capacities of the cranes to suit augmentation to the production plan within the building.
DetailsA $15 million dollar office project in Belmont that met the particular requirement of 24 hour operations and control centre, training facilities and administration for the St John Ambulance association.
DetailsThis two storey office development provides large scale and high grade commercial space to benefit both business and personnel use.
DetailsSt Quentin’s Apartments were architecturally conceived by CMP Architects to provide a striking gateway building to the Town Centre precinct of Claremont, and utilised revolutionary top-down construction and permanent form concrete walls to both speed completion of the project and integrate construction into the prestigious neighbourhood with minimum disruption.
Details