This beautiful 7 floor 42 apartment building in the heart of the prestigious East Perth district also features 2 levels of basement parking completed simultaneously using top-down construction, achieving significant savings and time efficiencies for the developers
Details
In an extremely complex and challenging build, the Award winning results achieved at Church House showcase the possibilities of the very best Top Down construction techniques in a landmark project for the industry.
Details
This modern office development located in Applecross utilised top-down construction to meet the financial limits of the client and make the project viable to construct.
Details
The State Theatre Centre of WA offers an iconic range of flexible spaces from an open air courtyard to the famous Health Ledger Theatre. This building faced a range of dynamic challenges from the placement, height restrictions, access and the theatre extending over 8 metres below the water table. The project received the 2011 Australia Engineers National Award for Excellence for its suite of solutions to these challenges.
Details
This award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.
Details
Multi level luxury apartment complex in Scarborough was designed for the use of glass fibre reinforced polymer reinforcement in concrete for the aquatic environment, top-down construction design, and post-tensioned concrete slabs for reinforcement
Details
Remediation of this community board walk located on Swan River used Glass Fibre Reinforced Polymer (GFRP) rods as reinforcement in concrete in place of steel to deliver a design with rated 75 years of longevity despite a corrosive aqueous environment.
Details
This prestigious 44 storey skyscraper borders on the Al Majaz lagoon in Sharjah comprises of 4 basement levels completed using top-down construction and Airey Taylor’s foundational design.
Details
Value engineering by Airey Taylor Consulting generated significant cost savings for this United Arab Emirates skyscraper, leading to it eventually being able to encompass 40 storeys in height
Details
Groundbreaking use of the Claylock(r) system stabilised the highly reactive clay soils enabling the construction of this two stage Health facility
Details