This bright and attractive coastal Secondary College in Perth’s northern suburbs used Airey Taylor Consulting’s deep understanding of educational project to create an unified campus with large spans, cantilevers and suspended stairwells reflecting the open and light setting.
Details
In an extremely complex and challenging build, the Award winning results achieved at Church House showcase the possibilities of the very best Top Down construction techniques in a landmark project for the industry.
Details
This modern office development located in Applecross utilised top-down construction to meet the financial limits of the client and make the project viable to construct.
Details
A $31 M sporting redevelopment as part of the ‘Claremont on the Park’ project
Details
Multi-use sports and recreational facility located in the City of Armadale, development of this site included the entire provision of
Details
This 4 storey commercial office with an underground basement features a six star energy rating and tight integration of Architectural intent to maximise light and energy absorption
Details
Renovation of existing building and addition of new multi purpose building to create a bright and functional centre of learning
Details
This award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.
Details
Multi level luxury apartment complex in Scarborough was designed for the use of glass fibre reinforced polymer reinforcement in concrete for the aquatic environment, top-down construction design, and post-tensioned concrete slabs for reinforcement
Details
Heavy pavement solutions for industrial equipment works for Westrac in multiple maintenance sites throughout WA and NSW; also included design of new administration and other facilities
Details