Airey Taylor Consulting
Structural, Civil, Engineering and Scientists
  • Home
  • About
    • About Us
    • History
    • Meet Our Directors
    • The Airey Taylor Consulting Difference
    • Award Winning Projects
    • Quality and Safety Policies
  • Innovations
    • Glass Fibre Reinforced Polymer (GFRP)
    • Top Down Construction
    • Value Engineering
    • Claylock®
    • RetroClay®
    • Rammed Earth Walling Systems
  • Expertise
    • Design for Durability
    • Cyclonic wind loading
    • Forensic Engineering
    • Post tensioned concrete design
    • Heritage
    • Permanent Form Concrete Walling systems
  • Capabilities
    • Civic
    • Civil
    • Commercial
    • Educational
    • Materials Science
    • Industrial
    • Multi Storey
    • Recreational
    • Residential
  • Projects
  • Contact us
  • White papers
  • Presentations
MENU CLOSE back  

Projects

You are here:
  1. Home
  2. Projects
View allAviationCivicCivilClaylock & RetroClayCollegesCommercialCorrosionForensic/ScientificGlass Fibre Reinforced PolymerIndustrialInstitutionalMixed UseMixed Use DevelopmentMulti StoreyPost tension slab designPrimary SchoolsRammed Earth WallingRecreationalResidentialSecondary schoolsShopping CentresSporting complexesSwimming PoolsTilt Up Walling SystemTop DownUniversitiesValue EngineeringWarehouses
Date Name
DescAsc

Dolphin and Boat Ramp, Horn Island

September 23, 2021By Airey Taylor ConsultingCivilCorrosionForensic/ScientificGlass Fibre Reinforced PolymerInnovationRoads

Airey Taylor Consulting’s structural design for Glass Fibre Reinforced Polymer using rods as reinforcement in concrete radically extend the life of this new Dolphin and Boat Ramp at Australia’s northern most Island

DetailsZoom

St Marks Senior Academic College, Hillarys

September 8, 2021By Airey Taylor ConsultingCar ParkCivilExpertiseInstitutionalPost tension slab designSecondary schools

This bright and attractive coastal Secondary College in Perth’s northern suburbs used Airey Taylor Consulting’s deep understanding of educational project to create an unified campus with large spans, cantilevers and suspended stairwells reflecting the open and light setting.

DetailsZoom

Christ Church Grammar School Boathouse Redevelopment, Claremont Foreshore

July 24, 2019By Airey Taylor ConsultingAquaticCivilCorrosionEnvironmentalForensic/ScientificInstitutionalRecreationalSecondary schools

Awarded Best Construction on a Challenging Site Award in the 2019 MBA Bankwest Awards, this project used the foremost Civil Engineering and Durability in Design expertise of Airey Taylor Consulting to create a new benchmark of foreshore developments.

DetailsZoom

Church House, Pier Street, Perth

September 21, 2015By Airey Taylor ConsultingCar ParkHeritageMulti StoreyMulti storey OfficesTop Down

In an extremely complex and challenging build, the Award winning results achieved at Church House showcase the possibilities of the very best Top Down construction techniques in a landmark project for the industry.

DetailsZoom

19 – 21 Kintail Road Office Development, Applecross

September 21, 2015By Airey Taylor ConsultingCar ParkCommercialMulti storey OfficesOfficesPost tension slab designTop DownValue Engineering

This modern office development located in Applecross utilised top-down construction to meet the financial limits of the client and make the project viable to construct.

DetailsZoom

Claremont Football Club (CFC) Development & Perth Transport Authority (PTA) Car-Park, Claremont

September 14, 2015By Airey Taylor ConsultingCar ParkCivilCorrosionMixed UsePost tension slab designRecreationalSporting complexes

A $31 M sporting redevelopment as part of the ‘Claremont on the Park’ project

DetailsZoom

Piara Waters Oval & Pavilion, Piara Waters

June 3, 2015By Airey Taylor ConsultingCar ParkCivicCivilEnvironmentalRecreationalSporting complexes

Multi-use sports and recreational facility located in the City of Armadale, development of this site included the entire provision of

DetailsZoom

WA Landfill Services Waste Recycling Facility Stage 1, Welshpool

September 21, 2014By Airey Taylor ConsultingCivilCorrosionEnvironmentalIndustrialPost tension slab designWarehouses

Civil engineering and pavement design for this project built in durability factors for the acidity of waste products and heavy load of equipment of the facility.

DetailsZoom

1154 – 1160 Hay Street, West Perth

January 26, 2014By Airey Taylor ConsultingCar ParkCivilCommercialEnvironmentalMulti StoreyMulti storey CommercialOfficesPost tension slab designTilt Up Walling System

This 4 storey commercial office with an underground basement features a six star energy rating and tight integration of Architectural intent to maximise light and energy absorption

DetailsZoom

Perth Early Years College, Mt Lawley

January 25, 2014By Airey Taylor ConsultingCar ParkCivilCollegesHeritageInstitutionalPrimary Schools

Renovation of existing building and addition of new multi purpose building to create a bright and functional centre of learning

DetailsZoom
Load more
 Dream-Theme — truly premium WordPress themes