WA Landfill Services Waste Recycling Facility Stage 1, Welshpool
Civil engineering and pavement design for this project built in durability factors for the acidity of waste products and heavy load of equipment of the facility.
Civil engineering and pavement design for this project built in durability factors for the acidity of waste products and heavy load of equipment of the facility.
Award-winning, highly structurally complex building containing research laboratories and offices for the renowned Telethon Child Institute of Health
Water polo pool designed for Trinity College
The Colonnade redevelopment transformed the existing retail development into an exciting mixed use facility in the heart of Subiaco, achieving cost efficiencies of $900,000 by using banded pre-stressed concrete design.
The State Theatre Centre of WA offers an iconic range of flexible spaces from an open air courtyard to the famous Health Ledger Theatre. This building faced a range of dynamic challenges from the placement, height restrictions, access and the theatre extending over 8 metres below the water table. The project received the 2011 Australia Engineers National Award for Excellence for its suite of solutions to these challenges.
This bright and attractive coastal Secondary College in Perth’s northern suburbs used Airey Taylor Consulting’s deep understanding of educational project to create an unified campus with large spans, cantilevers and suspended stairwells reflecting the open and light setting.
A $15 million dollar office project in Belmont that met the particular requirement of 24 hour operations and control centre, training facilities and administration for the St John Ambulance association.
Multi level shopping and car park development on the South Perth foreshore
German designed luxury motor vehicle dealership located in Mandurah, utilising Airey Taylor’s extensive Value Engineering and post-tensioned concrete experience to deliver a result of international quality.
This beautiful 7 floor 42 apartment building in the heart of the prestigious East Perth district also features 2 levels of basement parking completed simultaneously using top-down construction, achieving significant savings and time efficiencies for the developers