This award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.
St Quentin’s Apartments were architecturally conceived by CMP Architects to provide a striking gateway building to the Town Centre precinct of Claremont, and utilised revolutionary top-down construction and permanent form concrete walls to both speed completion of the project and integrate construction into the prestigious neighbourhood with minimum disruption.
The Colonnade redevelopment transformed the existing retail development into an exciting mixed use facility in the heart of Subiaco, achieving cost efficiencies of $900,000 by using banded pre-stressed concrete design.