This modern office development located in Applecross utilised top-down construction to meet the financial limits of the client and make the project viable to construct.
This award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build time by 5 months through the use of top-down construction.
Value engineering by Airey Taylor Consulting generated significant cost savings for this United Arab Emirates skyscraper, leading to it eventually being able to encompass 40 storeys in height
German designed luxury motor vehicle dealership located in Mandurah, utilising Airey Taylor’s extensive Value Engineering and post-tensioned concrete experience to deliver a result of international quality.
Airey Taylor Consulting are proud to have been associated with the outstanding avant-garde redevelopment that has seen the Central TAFE transformed into a significant public education facility.
The Colonnade redevelopment transformed the existing retail development into an exciting mixed use facility in the heart of Subiaco, achieving cost efficiencies of $900,000 by using banded pre-stressed concrete design.