St John Ambulance Office Building

LOCATION:

Belmont, Perth, Western Australia

YEAR OF COMPLETION:

2006

COLLABORATORS :

Oldfield Knott Architects

PROJECT VALUE:

$15 Million

The project comprised a new office building consisting of three levels of offices, a plant room level and a basement car park (partially below ground level).  The structure consists of post-tensioned flat slabs and columns which were a highly cost effective resolution for the project. The project also comprised structural alterations and additions as part of a total refurbishment to the existing office building. The Structural design incorporation of jointing within the structure to enable the Contractor to efficiently construct the structure by stages.

The new home of the St John Ambulance now houses it operational control room, training facilities and all other aspects of administration.

KEY DESIGN ELEMENTS:

  • Post tension slab design

More Projects

Sheraton Perth Hotel (now Pan Pacific)

Airey Taylor Consulting provided the initial design and subsequent engineering for all structural works on

South Perth Foreshore Connect South Canopies, South Perth

Airey Taylor Consulting's Structural Engineering skills enabled rapid modelling and structural design of the durable

Attakarn Prasit Apartments Bangkok

Prestigious multi level international apartment building for Australian Embassy staff housed in Bangkok