Eastern Goldfields Prison Retroclay Remediation, Boulder

LOCATION : Boulder, Western Australia

COLLABORATORS : John Holland, AMP Capital, Department of Corrections

PROJECT VALUE : Asset remediated worth $232 million

COMPLETED : November 2018

The initial build of this State Government facility completed construction in July 2016 – but the 350 prisoner facility at Boulder in the Eastern Goldfields had experienced substantial structural cracking within the course of its first year of operation. This was due to being sited on Class “H” soils (under AS2870) and subsequently large degrees of seasonal swelling/writhing of the clays on which its foundations were placed.

Using the Retroclay® system developed by Airey Taylor Consulting, the design and build team were quickly and inexpensively able to treat and permanently prevent further damage caused by clay movement. The  system artificially expands the structural footprint of the building, then raises the moisture content of the clays beneath this footprint to their maximum swell, locking in this swell and preventing any further movement around the perimeter causing cracking to the structure above. Repairs/remediation could then take place to the permanently stabilised buildings.

In this case, the 35 individual buildings were inexpensively treated and permanently remediated from cracking using this technique.

More Projects

LW Parry (Christ Church Grammar) Preparatory School, Claremont

This grand redesign of the prestigious Christ Church Grammar preparatory school centralises the functions in

Wagin & Lake Grace Hospital Upgrades, Regional Western Australia

Refurbishment of the Lake Grace & Wagin hospitals as part of a Southern Inland Health

Christ Church Grammar School – Collaborative Learning Centre

Significant expansion of Anglican day and boarding school for boys overlooking Freshwater Bay on the