WA Landfill Services Waste Recycling Facility Stage 1, Welshpool

LOCATION:

Welshpool, WA

CLIENT:

SITA

Airey Taylor Consulting provided the design and documentation of pavements and slabs for incorporation in a future roofed waste recycling facility. Design considerations included accommodating the mild acidity of the waste recycling and the loads resulting from large-scale equipment in use including front-end-loaders.

The internal slabs were designed using post-tensioned concrete to eliminate joints and to give greater in-service durability. Sacrificial layers of different coloured concrete was incorporated into the design to be replaced when worn down to the main pavement slab.

Provision for the future incorporation of high level canopy was included in the perimeter design.

More Projects

Central TAFE, Northbridge

Airey Taylor Consulting are proud to have been associated with the outstanding avant-garde redevelopment that

Peel Hospital Complex

This outstanding project was adopted by the State Government as a model for design of

19 – 21 Kintail Road Office Development, Applecross

This modern office development located in Applecross utilised top-down construction to meet the financial limits