WA Landfill Services Waste Recycling Facility Stage 1, Welshpool

LOCATION:

Welshpool, WA

CLIENT:

SITA

Airey Taylor Consulting provided the design and documentation of pavements and slabs for incorporation in a future roofed waste recycling facility. Design considerations included accommodating the mild acidity of the waste recycling and the loads resulting from large-scale equipment in use including front-end-loaders.

The internal slabs were designed using post-tensioned concrete to eliminate joints and to give greater in-service durability. Sacrificial layers of different coloured concrete was incorporated into the design to be replaced when worn down to the main pavement slab.

Provision for the future incorporation of high level canopy was included in the perimeter design.

More Projects

Sheraton Perth Hotel (now Pan Pacific)

Airey Taylor Consulting provided the initial design and subsequent engineering for all structural works on

Lukeis Residence – Foundation Remediation

This landmark Retroclay remediation project permanently repaired damage to this residential structure due to seasonal

Southshore Shopping Complex, South Perth

Multi level shopping and car park development on the South Perth foreshore