St Mary’s Indoor Recreation & Aquatic Centre, Penrith

LOCATION:

Penrith, New South Wales

COLLABORATORS:

Client: Council of Penrith

Architect: Barry Hall & Associates

PROJECT VALUE:

$4.7 M

PROJECT COMPLETED:

1995

AWARDS:

1995 Master Builder’s Association (NSW) Excellence in Construction Awards
Certificate of Commendation

Airey Taylor Consulting provided structural, civil & geotechnical engineering services for this $4.7 million project which established new benchmarks for excellence in municipal design throughout Australia.

The project involved the redevelopment of existing outdoor swimming pool with an optimal mix of old and new facilities. The responsive structural design fully met architectural demands for large, open, visually unimpeded space. Functional engineering design catered for provision of facilities within the chemically hostile environment.

As with the Waratah Indoor Recreation and Aquatic Centre for the Shire of Sutherland in NSW, also designed by Airey Taylor Consulting, this project has established new benchmarks for excellence of design.

More Projects

Central TAFE, Northbridge

Airey Taylor Consulting are proud to have been associated with the outstanding avant-garde redevelopment that

Cockburn Central Stage 3, Success

This award-winning shopping centre reduced the tender cost from $112M to $79.7M and accelerated build

West Coast Highway Extension

Award winning highway extension in Western Australia