Adaptive re-use of this Heritage structure used the full suite of Airey Taylor Consulting’s Scientific and Structural skills; proving that adaptation and restoration of upper level Heritage structures with continued use of ground floor tenancies can be a more attractive option for owners than the current industry practice of facadism in Heritage settings.
Details
An attractive mixed use multi-storey development in booming Mt Lawley that references the art deco architecture of the area, this development uses the sloping site cleverly to showcase optimum city views and a number of engineering methods to streamline construction.
Details
This grand redesign of the prestigious Christ Church Grammar preparatory school centralises the functions in an elegant multistorey building that promotes the ethos of innovation and togetherness for its 500 young students opened for the 2019 school year.
Details
This beautiful 7 floor 42 apartment building in the heart of the prestigious East Perth district also features 2 levels of basement parking completed simultaneously using top-down construction, achieving significant savings and time efficiencies for the developers
Details
Winner of the 2018 Best Educational Build in the Master Builder’s WA Excellence in Construction Awards, this $45 M project forms a significant link of education and industry in Perth and realises the superb aesthetic of Armstrong Parkin Architects to memorable effect.
Details
In an extremely complex and challenging build, the Award winning results achieved at Church House showcase the possibilities of the very best Top Down construction techniques in a landmark project for the industry.
Details
This modern office development located in Applecross utilised top-down construction to meet the financial limits of the client and make the project viable to construct.
Details
Re-construction and refurbishment of the Claremont Council Chambers previously destroyed by fire, adding three storeys of functional and attractive office space while restoring the heritage fronting.
Details
Partial retention of existing building to accommodate new multi storey offices for the Richmond Fellowship, serving their administrative, training and outreach services.
Details
Winner of the 2017 Master Builders Association/Bankwest Best Project overall, this project features extensive use of post tensioned concrete to achieve its award winning result
Details