{"id":5819,"date":"2025-12-18T04:24:53","date_gmt":"2025-12-18T04:24:53","guid":{"rendered":"https:\/\/atconsulting.com.au\/_staging\/project\/wa-landfill-services-waste-recycling-facility-stage-1-welshpool\/"},"modified":"2025-12-18T04:24:53","modified_gmt":"2025-12-18T04:24:53","slug":"wa-landfill-services-waste-recycling-facility-stage-1-welshpool","status":"publish","type":"project","link":"https:\/\/atconsulting.com.au\/_staging\/project\/wa-landfill-services-waste-recycling-facility-stage-1-welshpool\/","title":{"rendered":"WA Landfill Services Waste Recycling Facility Stage 1, Welshpool"},"content":{"rendered":"<p><strong>LOCATION:<\/strong><\/p>\n<p>Welshpool, WA<\/p>\n<p><strong>CLIENT:<\/strong><\/p>\n<p>SITA<\/p>\n<p>Airey Taylor Consulting provided the design and documentation of pavements and slabs for incorporation in a future roofed waste recycling facility. Design considerations included accommodating the mild acidity of the waste recycling and the loads resulting from large-scale equipment in use including front-end-loaders.<\/p>\n<p>The internal slabs were designed using post-tensioned concrete to eliminate joints and to give greater in-service durability. Sacrificial layers of different coloured concrete was incorporated into the design to be replaced when worn down to the main pavement slab.<\/p>\n<p>Provision for the future incorporation of high level canopy was included in the perimeter design.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Civil engineering and pavement design for this project built in durability factors for the acidity of waste products and heavy load of equipment of the facility.<\/p>\n","protected":false},"featured_media":5820,"parent":0,"template":"","meta":{"_acf_changed":false},"dt_portfolio_category":[118,112,122,132,101,133],"featured":[87],"class_list":["post-5819","project","type-project","status-publish","has-post-thumbnail","hentry","dt_portfolio_category-civil","dt_portfolio_category-durability","dt_portfolio_category-environmental","dt_portfolio_category-industrial","dt_portfolio_category-post-tensioned-concrete","dt_portfolio_category-warehouses","featured-featured"],"acf":[],"_links":{"self":[{"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/project\/5819","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":0,"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/project\/5819\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/media\/5820"}],"wp:attachment":[{"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/media?parent=5819"}],"wp:term":[{"taxonomy":"dt_portfolio_category","embeddable":true,"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/dt_portfolio_category?post=5819"},{"taxonomy":"featured","embeddable":true,"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/featured?post=5819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}