{"id":5630,"date":"2025-12-18T04:24:20","date_gmt":"2025-12-18T04:24:20","guid":{"rendered":"https:\/\/atconsulting.com.au\/_staging\/project\/guildford-hotel-redevelopment-guildford\/"},"modified":"2025-12-18T04:24:20","modified_gmt":"2025-12-18T04:24:20","slug":"guildford-hotel-redevelopment-guildford","status":"publish","type":"project","link":"https:\/\/atconsulting.com.au\/_staging\/project\/guildford-hotel-redevelopment-guildford\/","title":{"rendered":"Guildford Hotel Redevelopment, Guildford"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Location : \u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\">Guildford, Western Australia<\/p>\n<p style=\"text-align: justify;\"><strong>Collaborators :\u00a0\u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\">Fratelle Froup of Architects<\/p>\n<p style=\"text-align: justify;\">Ultimo Design and Construct<\/p>\n<p style=\"text-align: justify;\"><strong>Value: \u00a0 \u00a0 \u00a0 \u00a0 \u00a0<\/strong><br \/>\nLess than $5 million<\/p>\n<p style=\"text-align: justify;\"><strong>Completed : \u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\">December 2017<\/p>\n<p style=\"text-align: justify;\"><strong>Awards : \u00a0 \u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\"><span style=\"text-decoration: underline;\">2018 Global Architecture and Design Awards<strong><br \/>\n<\/strong><\/span>Third Award &#8211; Category (Hospitality &#8211; Built)<br \/>\n<span style=\"text-decoration: underline;\">2017 Master Builder\u2019s Association\u00a0Australia Excellence in Construction Awards<br \/>\n<\/span>Best Commercial\/Industrial Building under $5 million<\/p>\n<p style=\"text-align: justify;\"><span style=\"text-decoration: underline;\">2017 National Association of Building Designers<\/span><br \/>\nBest Heritage Design<br \/>\nBest Non-Residential Interior Design<br \/>\nBest Alteration\/Addition Commercial Design<\/p>\n<p style=\"text-align: justify;\"><span style=\"text-decoration: underline;\">2017 Building Designers Association of WA<\/span><br \/>\nBest Heritage Design<br \/>\nBest Sustainable Design \u2013 Commercial<br \/>\nBest Public Building Design<br \/>\nBest Commercial Alteration\/Addition over $1M<br \/>\nBest Non Residential Interior Design<\/p>\n<p style=\"text-align: justify;\">The iconic heritage listed Guildford Hotel (1886) was extensively damaged by fire in 2008; then subject to further flooding as it lay in a derelict state. Restoration works commenced in 2014 after the WA Heritage Council gave approval for partial re-roofing of the hotel and the state government contributed $100,000 for its construction.<\/p>\n<p style=\"text-align: justify;\">Airey Taylor was responsible for the preparation of a dilapidation survey of the existing fabric of the fire damage and provision of advice on how existing external walls could be retained and their integrity preserved. ATC provided an outline of &#8216;urgent works&#8217; including wall stabilisation, conservation of brickwork and render and weatherproofing of building before design and documenting the structural component of the redevelopment. The review by Airey Taylor was key to ensure timbers &amp; bricks were reinstated, or recycled &amp; reused wherever possible.<\/p>\n<p style=\"text-align: justify;\">Structural input to adaptive re-use was key to enabling the Architect Fratelle to complete a design exposing the remaining original &amp; burnt features within the space. Double height voids were created in the space characterised by the partial loss of the first floor to create cavernous main bar areas, &amp; function &amp; private dining rooms added to the upper level. An internal courtyard has been created within the confines of the external walls that provide a unique indoor \/ outdoor experience for patrons.<\/p>\n<p style=\"text-align: justify;\">ATC provided Quality Assurance inspection during construction and certifying compliance with design and documentation structural requirement at completion, design and documentation of Belvedere and of a Retractable Roof Support, design and documentation of the future retail area and construction phase services, design and sketch and advise on fit out, investigation of future proofing of timber floors, wind loading for glazing, level 1 activation works being strengthening existing floors and advice on the underpinning for a lift pit, rectification of the James St fa\u00e7ade, design and sketches of mezzanine a walkway and a physical check and attesting to adequacy of the balustrade. Assessment and remediation of concrete beams with industrial galvanic anodes strategy was utilised to minimise concrete breakout and preserve otherwise critically damaged concrete beams.<\/p>\n<p style=\"text-align: justify;\">Due to the importance of the redevelopment to the local community, Premier Colin Barnett cut the ribbon to the 1886 built hotel in 2016.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This project restores the function and feel of the classic Guildford Hotel to the community, following a devastating fire and subsequent flooding and disrepair to the heritage listed venue.  Every care was taken to restore the facility to its former glory, using original materials wherever possible and contemporary new facilities and fit-out.<\/p>\n","protected":false},"featured_media":5631,"parent":0,"template":"","meta":{"_acf_changed":false},"dt_portfolio_category":[88,106,110,94],"featured":[87],"class_list":["post-5630","project","type-project","status-publish","has-post-thumbnail","hentry","dt_portfolio_category-capabilities","dt_portfolio_category-commercial","dt_portfolio_category-heritage","dt_portfolio_category-recreational","featured-featured"],"acf":[],"_links":{"self":[{"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/project\/5630","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":0,"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/project\/5630\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/media\/5631"}],"wp:attachment":[{"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/media?parent=5630"}],"wp:term":[{"taxonomy":"dt_portfolio_category","embeddable":true,"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/dt_portfolio_category?post=5630"},{"taxonomy":"featured","embeddable":true,"href":"https:\/\/atconsulting.com.au\/_staging\/wp-json\/wp\/v2\/featured?post=5630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}