WA Landfill Services Waste Recycling Facility Stage 1, Welshpool

LOCATION:

Welshpool, WA

CLIENT:

SITA

Airey Taylor Consulting provided the design and documentation of pavements and slabs for incorporation in a future roofed waste recycling facility. Design considerations included accommodating the mild acidity of the waste recycling and the loads resulting from large-scale equipment in use including front-end-loaders.

The internal slabs were designed using post-tensioned concrete to eliminate joints and to give greater in-service durability. Sacrificial layers of different coloured concrete was incorporated into the design to be replaced when worn down to the main pavement slab.

Provision for the future incorporation of high level canopy was included in the perimeter design.

More Projects

Wagin & Lake Grace Hospital Upgrades, Regional Western Australia

Refurbishment of the Lake Grace & Wagin hospitals as part of a Southern Inland Health

Kewdale Central

This two storey office development provides large scale and high grade commercial space to benefit

Building 311 Superlab PC2 Pilot, Curtin University, Bentley

This multidiscplinary science building for Curtin University students uses an adaptation of an existing concrete