St Mary’s Indoor Recreation & Aquatic Centre, Penrith

LOCATION:

Penrith, New South Wales

COLLABORATORS:

Client: Council of Penrith

Architect: Barry Hall & Associates

PROJECT VALUE:

$4.7 M

PROJECT COMPLETED:

1995

AWARDS:

1995 Master Builder’s Association (NSW) Excellence in Construction Awards
Certificate of Commendation

Airey Taylor Consulting provided structural, civil & geotechnical engineering services for this $4.7 million project which established new benchmarks for excellence in municipal design throughout Australia.

The project involved the redevelopment of existing outdoor swimming pool with an optimal mix of old and new facilities. The responsive structural design fully met architectural demands for large, open, visually unimpeded space. Functional engineering design catered for provision of facilities within the chemically hostile environment.

As with the Waratah Indoor Recreation and Aquatic Centre for the Shire of Sutherland in NSW, also designed by Airey Taylor Consulting, this project has established new benchmarks for excellence of design.

More Projects

Christ Church Grammar School Boathouse Redevelopment, Claremont Foreshore

Awarded Best Construction on a Challenging Site Award in the 2019 MBA Bankwest Awards, this

LW Parry (Christ Church Grammar) Preparatory School, Claremont

This grand redesign of the prestigious Christ Church Grammar preparatory school centralises the functions in

204 Walcott Street, Mt Lawley

An attractive mixed use multi-storey development in booming Mt Lawley that references the art deco