ADIA Tower

LOCATION:

United Arab Emirates

PARTNERS:

  • Samsung
  • Abu Dhabi Investment Authority

PROJECT VALUE:

$200 M

COMPLETED : 

2006

Airey Taylor Consuting (formerly Airey Ryan & Hill) were engaged by Samsung to perform a value engineering study on the 40 storey Abu Dhabi Investment Authority head office building in the United Arab Emirates.

The option identified delivered a cost savings of US $20 million to the budgeted value of US $200 million – the proposed cost of the design as presented for tender. Samsung were engaged to build the ADIA Tower building and associated carpark and the Abu Dhabi Investment Authority instructed the original Engineering group to redesign and redocument the building in accordance with the methodology identified by Airey Taylor Consulting.

ADIA then chose to increase the size of the building by additional floors to expand the cost to the original budget of US $200 million. Samsung were hence successful with their tender.

KEY DESIGN ELEMENTS:

More Projects

Goldman Apartments

This innovative luxury apartment design in South Perth was lauded as best design and build

Windsor Towers balconies retrofit, South Perth

This ambitious structural program involved a retrofit 80 balconies to an existing South Perth apartment

South Metropolitan TAFE (Murdoch Campus T block)

Winner of the 2018 Best Educational Build in the Master Builder's WA Excellence in Construction