Crown Towers, Perth

LOCATION:

Crown resort, Burswood, Perth WA

COMPLETION DATE:

Late 2016

COLLABORATORS:

Brookfield Multiplex

Central Pre-stressing

PROJECT VALUE:

$570 M

AWARDS :

2017 Master Builders Association WA/Bankwest Excellence in Construction Awards
Best Project
Best Building Fit-Out
Best Multi-Unit Development (Over 20 Units/Over $50 million)

Airey Taylor Consulting were engaged by Central Pre-stressing to provide engineering services during construction, following their design and extensive shop drawing documentation of all post-tensioned levels for the development.  It features a split 15 and 22 storey tower with 3 podium levels.

The use of post-tensioned concrete suspended floor slabs and piled foundations was significant as they enabled building upon a problematic site that was a reclaimed garbage dump. The completed designs were delivered to meet an aggressive construction schedule and were fully co-ordinated for a gross floor area of 80,000 square metres.

The 500 guestroom, 6 star hotel is now the largest hotel in Perth – and will serve as a landmark development for Western Australian hospitality.  Congratulations to all contributors in bringing this beautiful and iconic project to fruition.

KEY DESIGN ELEMENTS:

More Projects

Claremont Football Club (CFC) Development & Perth Transport Authority (PTA) Car-Park, Claremont

A $31 M sporting redevelopment as part of the 'Claremont on the Park' project

Craigie Leisure Centre redevelopment, Craigie

This winner of the Parks and Leisures (WA) Community Facility of the Year award demonstrates

Port Mandurah – Canal Development

LOCATION: Port Mandurah, Western Australia AWARDS : 1991 Association of Consulting Engineers of Australia (WA)