Forrestdale South West Primary School Stage 1 + 2

Collaborators : Oldfield Knott Architects, PACT Construction (Stage 2), Firm Construction (Stage 1)

Project Value : $13.3 M (Stage 2)

Completed : January 2019

The first stage of this project consisted of forward works, covered playground area, a kindergarten and demountables with the second phase providing the Wandi area with a modern Primary School – consisting of 5 teaching blocks, a library, a covered assembly area and the central administration building.

Airey Taylor Consulting provided structural engineering for the project, whose site featured a similar high water table to the nearby Piara Waters Pavilion, another Airey Taylor project.

Structural Works consisted largely of structural steel, concrete slab and footings, and brickwork – with some anti-corrosive work and galvanisation of exposed steel and cavities due to the slight corrosive nature of coastal winds reaching the inland site. The main variation of the Stage 2 structure from standard Department of Education designs was in the inclusion of clerestories – skylights that will increase natural illumination of the classroom and administration buildings.

Completion of this facilities further enhances the growing Forrestdale South community.

More Projects

TVW Telethon Institute for Child Health Research

Award-winning, highly structurally complex building containing research laboratories and offices for the renowned Telethon Child

Leschenault Sports Hall & Aquatic Centre

Multi purpose recreation and aquatic centre in Australind

Balgo + Kalumburu Aquatic Centres, Kimberley

These two Aquatic facilities in the Kimberley have become the focal point for health and